UPM's new Paso de los Toros pulp mill recently opened its commissioning phase to test the pulp production equipment, with the approval of the Uruguayan environmental authorities.
During this phase, UPM will thoroughly inspect the many areas and operational requirements of the pulp mill in preparation for full operation. Areas include the lumber yard, woodchip handling, fiber line, pulp drying, evaporation unit, alkali recovery boiler, biomass boiler, auxiliary boiler, white liquor unit, steam generation and turbine, wastewater treatment, sludge treatment, oxygen unit, auxiliary systems, and industrial solid waste final disposal site. The tests also included the receipt of chemicals and wood used after commissioning.
All commissioning has been approved by the Uruguayan authorities under the Environmental Management Plan (EMP) and will be subject to rigorous environmental monitoring, including air and water quality measurements and records.
Niso is professional supplier of fluff pulp, SAP, non-woven, diaper raw materials, snaitary napkin raw materials, and baby diaper machine, adult diaper machine, sanitary napkin machine, under pad machine, pet pad machine. If you have any demand on these products, please feel free to contact admin@ycmachine.com.cn , your inquiry will be replied immediately